Case Studies
NHS – Welfare & training
Training Facility set up This project consisted of turning a “shell and core” area into a new Staff Welfare & Training Facility. Due to the hospital expanding, a larger area was required to...
S&P Global
TPN Distribution Boards Optimise were required to install 72 new 24-way TPN Distribution Boards in an occupied building in Canary Wharf. Each board needed to be bespoke designed and fabricated to...
Bank street
Generator Mist Project We designed and installed the generator mist project at 20 Bank Street, London, which required the installation of a new water storage tank and pump set. Optimise were...
Hospital A&E
Hospital A&E In an Essex Hospital we undertook a full electrical installation of a new A&E Department. The project was originally planned over an eight-week period, but due to unforeseen...
F45 Stratford
F45 Stratford We had great fun with Dan and his personal training team, building their gym in Here East. F45 Gym is the new training technique leaving competition and clients gasping for air. F45 is...
LED Lighting Upgrade in Canary Wharf
LED Lighting Upgrade in Canary Wharf This Project was to upgrade all the lighting in the building's Reception, lift lobby areas, mezzanine and exterior of the building. We reduced the energy...