by admin | Oct 27, 2021 | Case Study
Training Facility set up This project consisted of turning a “shell and core” area into a new Staff Welfare & Training Facility. Due to the hospital expanding, a larger area was required to become the new Point of Care Training Facility. The area was newly...
by admin | Oct 27, 2021 | Case Study
TPN Distribution Boards Optimise were required to install 72 new 24-way TPN Distribution Boards in an occupied building in Canary Wharf. Each board needed to be bespoke designed and fabricated to fit into the existing risers, due to the lack of space. Before...
by admin | Oct 27, 2021 | Case Study
Generator Mist Project We designed and installed the generator mist project at 20 Bank Street, London, which required the installation of a new water storage tank and pump set. Optimise were instructed to create a blockwork bunded sump for the new equipment to be...
by admin | Oct 27, 2021 | Case Study
Theatre machinery installation & set up Following a requirement for local hospitals to have more availability for advanced medical equipment, Optimise were asked to supply an electrical installation to support the new operating theatre machinery. Over a four-week...
by admin | Oct 27, 2021 | Case Study