Generator Mist Project

We designed and installed the generator mist project at 20 Bank Street, London, which required the installation of a new water storage tank and pump set. Optimise were instructed to create a blockwork bunded sump for the new equipment to be housed in. in addition to the bund, we installed a leak detection system and sump pump, as well as a new distribution board to serve each piece of new equipment. A boosted cold-water feed was run from a local supply to feed the new system. The installed sump pump had a discharge line installed that would be used to evacuate any water into an existing waste stack.

Our client:
Project:
Sector:
Duration:
Start:
Completion:

Bank Street
Generator Mist
Financial
6 weeks
July 2021
August 2021